
ATC has now finalized their route for the transmission line to energize Rock Energy Cooperatives new substation near the S/E area of the City. Click on this link for a recent press release and route map: http://www.ci.milton.wi.us/document_detail.aspx?document_id=3035. Many residents had expressed concerns about a route running along the rail corridor through the City. Those residents will be relieved because ATC has selected a route to the south of the City and along the new STH 26.